|
| 17 August 001 |
|
|
|
Winding Hole |
|
|
|
17 August 002 |
|
|
Pump is needed to keep the
water out while excavating
continues. |
|
|
 |
|
|
|
|
|
|
|
|
|
|
| 17 August 007 |
|
|
|
Looking towards the River Thames |
|
|
|
17 August 008 |
|
|
The sides of the cut are
being lined with a mesh that
will allow water plants to
root easily. |
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17 August 016 |
|
|
Not long now and boats will
pass through here. |
|
|
 |
|
|
|
|
|
|
| 17 August 019 |
|
|
|
Looking from the junction towards
the winding hole. |
|
|
|
|
|
|
|
17 August 022 |
|
|
There will be gates at each
end of the permissive
footpath. |
|
|
 |
|
|
|
|
|
|
|
17 August 026 |
|
|
Gate
undergoing final testing by
WRG. |
|
|
 |
|
|
|
|
|
|
| 17 August 029 |
|
|
|
This
will be landscaped. |
|
|
|
17 August 030 |
|
|
There is another fishing
lake alongside the cut.
The bank of this is also
being landscaped. |
|
|
 |
|
|
|